izzzi.life Lime
DLD developer no. 1985 · ORANGE GROUP BUYING AND SELLING OF REAL ESTATE CO. L.L.C
Data last checked 11 Nov 2026
Residential building consisting of 218 units with a layout of B + G + 2P + 7 + Roof, featuring amenities such as a gym and swimming pool.
This project on Google
Sale register covers the last ~3 months.
No sales match this filter in the stored window.
izzzi.life Lime: common questions
Is izzzi.life Lime delayed?
Not by DLD figures. Construction was 2.97% complete at the last DLD inspection on 5 October 2026, in line with or ahead of its registered timeline (about 26% expected by then, planned completion 12 June 2029).
When is the handover of izzzi.life Lime?
The planned completion date registered with Dubai Land Department is 12 June 2029. Handover usually follows completion; the developer confirms the exact date.
How much of izzzi.life Lime is built?
Construction was 2.97% complete at the last DLD inspection on 5 October 2026, as published by Dubai Land Department.
Where is izzzi.life Lime located?
izzzi.life Lime is in Al Satwa, Dubai.
Who is the developer of izzzi.life Lime?
izzzi.life Lime is developed by ORANGE GROUP BUYING AND SELLING OF REAL ESTATE CO. L.L.C (DLD developer no. 1985). It is registered with Dubai Land Department as project no. 4309, with 218 units.
Does izzzi.life Lime have an escrow account?
Yes. Dubai Land Department open data lists escrow account 0205885384804. Always confirm the account with the developer or in the Dubai REST app before paying.
Answers are generated from Dubai Land Department open data shown on this page.